View Details
| Bid Classification: |
Construction
|
|---|---|
| Bid Type: | RFT-ITT |
| Bid Number: | 2026-016 |
| Bid Name: | RECONSTRUCTION OF RUE ST-JEAN PHASE 2B |
| Bid Status: | Open |
| Published Date: | Wed May 6, 2026 10:00:01 AM (EDT) |
| Bid Closing Date: | Wed Jun 3, 2026 2:00:01 PM (EDT) |
| Question Deadline: | Wed May 27, 2026 2:00:00 PM (EDT) |
| Duration in months: | 12 |
| Negotiation Type: | Refer to project document |
| Condition for Participation: | Refer to project document |
| Electronic Auctions: | Not Applicable |
| Language for Bid Submissions: | English unless specified in the bid document |
| Submission Type: | Online Submissions Only |
| Submission Address: | Online Submissions Only |
| Public Opening: | No |
| Description: |
This statement outlines the scope and primary deliverables for Phase B of Phase 2 of the ongoing infrastructure improvement project in Clarence-Rockland, Ontario. Phase A, now complete, involved the construction of a berm to facilitate the relocation of existing Hydro One infrastructure, as well as the installation of a 79.5-metre-long culvert measuring 2.4 metres in height by 4.8 metres in width. Phase B will advance the project with the construction of two new roundabouts. The scope of work includes the importation and placement of approximately over 13,000 cubic meters of fill material required for grading and road base development. This phase also includes the installation of sanitary sewers (provisional), storm sewers, watermain infrastructure, and all associated utilities, including streetlight installation. It also includes the abandonment of an existing 276-metre-long watermain and general landscaping, including the landscaping of the roundabout centre islands and restoration of disturbed areas with topsoil, sod, and hydroseed. A key consideration during construction is that the west and south legs of the intersection at Poupart Road and St-Jean Street must remain open to traffic at all times. St-Jean Street will be closed between Docteur Corbeil Boulevard and the intersection with Poupart Road. Contractors will be required to plan and stage all work activities accordingly to maintain the traffic access. |
| Bid Document Access: | Bid document preview, bid opportunity, and award notices are available on the site free of charge. Suppliers are not required to register for a bid opportunity prior to previewing unsecured bid documents. Please note, some documents may be secured and you will be required to register for the bid to download and view the documents. To download secured documents and/or to participate in this opportunity, you will need to have a subscription plan or buy Pay-Per-Bid access for this opportunity (available if you don't have an active subscription). |
| Trade Agreements: |
Show Trade Agreements [+]
Canadian Free Trade Agreement (CFTA)
|
| Categories: |
Show Categories [+]
|