View Details
| Bid Classification: |
Construction
|
|---|---|
| Bid Type: | RFT-ITT |
| Bid Number: | 2025-026 |
| Bid Name: | CARON AND EDWARDS WATER TRANSMISSION MAINS |
| Bid Status: | Awarded |
| Bid Awarded Date: | Wed Sep 10, 2025 (EDT) |
| Published Date: | Fri Jul 18, 2025 2:45:01 PM (EDT) |
| Bid Closing Date: | Wed Sep 3, 2025 2:00:01 PM (EDT) |
| Question Deadline: | Fri Aug 22, 2025 2:00:00 PM (EDT) |
| Duration in months: | 17 |
| Negotiation Type: | Refer to project document |
| Condition for Participation: | Refer to project document |
| Electronic Auctions: | Not Applicable |
| Language for Bid Submissions: | English unless specified in the bid document |
| Submission Type: | Online Submissions Only |
| Submission Address: | Online Submissions Only |
| Public Opening: | No |
| Description: |
The purpose of the new Caron Transmission Main is to supply drinking water to future growth areas. The scope of work is to install approximately 10 km of 450 mm diameter watermain via Open Cut and Horizontal Directional Drilling (HDD). The alignment starts at the Caron Booster Station and goes South along Caron St. to Baseline Rd, East along Baseline Rd. to Bouvier Rd, and south along Bouvier Rd. to the Bouvier Water Tower. HDD will be completed for culvert crossings in various sections while the remaining watermain will be constructed using open cut method. No modifications to the culverts will occur in this project and no water services will be connected to this transmission main as its purpose is as a dedicated transmission main, not for local distribution. The purpose of the new Edwards Transmission Main is to supply drinking water to future growth areas. The scope of work is to install approximately 600 m of 600 mm diameter watermain via Open Cut method. The alignment starts at the Rockland Water Treatment Plant and goes South along Edwards St. to just North of County Rd. 17. No water services will be connected to this transmission main as its purpose is as a dedicated transmission main, not for local distribution. The schedule for this project is as follows:
|
| Bid Document Access: | Bid document preview, bid opportunity, and award notices are available on the site free of charge. Suppliers are not required to register for a bid opportunity prior to previewing unsecured bid documents. Please note, some documents may be secured and you will be required to register for the bid to download and view the documents. To download secured documents and/or to participate in this opportunity, you will need to have a subscription plan or buy Pay-Per-Bid access for this opportunity (available if you don't have an active subscription). |